Licensed in Delaware, Maryland & Virginia  ·  Insured · Bonded · OSHA 30 Seaford, DE  ·  admin@hastingsmarineconstruction.com
Hastings Marine Construction

Sussex County, Delaware · 19971

Marine Construction in Rehoboth Beach, DE

Canal frontage, bay frontage and Silver Lake, on some of the most valuable waterfront in the state. Small lots, high property values and strict review — a combination that rewards getting the permit right the first time.

The water around Rehoboth Beach

Coastal and back-bay water: Rehoboth Bay, the Lewes-Rehoboth Canal and Silver Lake — about 33 miles east of the shop.

Rehoboth waterfront is small-lot, high-value and closely reviewed, and the canal frontage in particular sits under real scrutiny. Getting the permit right the first time is worth more here than anywhere else we work, because a resubmission can cost a whole season.

Access. Constrained sites and summer restrictions — off-season scheduling is often the smart move. We cover ZIP code 19971 and the surrounding Sussex County shoreline.

What that usually argues for. Bulkhead where the lot runs to the water and there is no room to slope, rip-rap revetment where there is. Anything built here has to assume the worst summer weekend, not the average day.

Questions we get about Rehoboth Beach water

Can work be done during the summer season?

Sometimes, but access and local restrictions make it harder and slower. Most Rehoboth work is better scheduled outside the season.

How long does the permit really take here?

Plan on the longer end of the three to twelve month range, and start early.

Permits in Delaware

Shoreline work in Delaware is regulated, and almost anything built in or over the water needs approval from the Delaware Department of Natural Resources and Environmental Control. We handle that in house — preparing the plans, completing the applications and coordinating with the agencies.

Budget three to twelve months for agency review depending on the complexity of the project. It is the part of the schedule most people underestimate, so it is worth starting the conversation well before the season you want to be using the water.

Rehoboth Beach services

Bulkhead repair, docks and boat lifts in Rehoboth Beach

Bulkhead repair in Rehoboth Beach

Lots on Rehoboth Bay, the canal and Silver Lake are small and closely reviewed, so a bulkhead repair here is planned around the permit first. Getting it approved the first time can save a season, and the work is usually best done off-season, before summer access closes in.

Dock builder in Rehoboth Beach

As a dock builder, we build and repair fixed piers and floating docks on Rehoboth Bay and the Lewes-Rehoboth Canal, sized for tight lots and scheduled around summer restrictions.

Boat lift installation in Rehoboth Beach

Boat lift installation on canal and bay lots: a DECO lift on piling driven for it, or an elevator lift on the wall where the frontage is too tight for piling.

What we build here

The work that suits Rehoboth Beach water.

Nearby

We work the rest of this water too.

Every town we serve

Get started

Send us a photo of your waterfront.

Tell us what the water is doing and what you want out of the property. We’ll evaluate the site, give you a detailed estimate covering scope, materials, timeline and price, and handle the permitting. Commercial, municipal and agency inquiries reach the same phone.

Start a project

Or send a photo straight from the inquiry form — it takes file uploads.

Call (888) 519-2253