Kent County, Delaware · 19943
Marine Construction in Felton, DE
Killens Pond country, on the upper Murderkill. Impoundment shoreline behaves differently from tidal bank — the level is managed rather than natural, and what fails is usually the toe rather than the top.
The water around Felton
Millpond and impoundment water: Killens Pond, the Murderkill headwaters and farm ponds — about 30 miles north of the shop.
Killens Pond country, on the upper Murderkill. An impoundment shoreline behaves differently from a natural one: the level is managed, the wind still builds chop across open water, and what fails is nearly always the toe.
Access. Good access, and close enough to the shop to be practical for smaller work. We cover ZIP code 19943 and the surrounding Kent County shoreline.
What that usually argues for. Stone toe protection and grading do most of the work. Fixed piers suit most pond frontage, floating docks work where the water is deep enough to keep the floats off the bottom, and access structures down a steep bank are common.
Questions we get about Felton water
Why does my pond bank fail at the bottom and not the top?
Because that is where the water works. Fix the toe and the top generally looks after itself.
Is a managed water level a problem for building?
It is a scheduling consideration more than an engineering one — there are better and worse times of year to be working at the edge.
Permits in Delaware
Shoreline work in Delaware is regulated, and almost anything built in or over the water needs approval from the Delaware Department of Natural Resources and Environmental Control. We handle that in house — preparing the plans, completing the applications and coordinating with the agencies.
Budget three to twelve months for agency review depending on the complexity of the project. It is the part of the schedule most people underestimate, so it is worth starting the conversation well before the season you want to be using the water.
What we build here
The work that suits Felton water.
Rip-Rap
DelDOT-rated stone revetments, sized to the exposure and placed over proper filtration and bedding.
Read morePiers & Docks
Fixed piers, docks and floating docks across Delmarva’s waterways — built from CCA-treated piling and framing, with a choice of decking.
Read moreWaterfront Decks & Access Steps
Safe, solid access from the yard to the water across slopes, grade changes and bank heights of every kind.
Read moreShoreline Protection
Rip-rap, living shorelines and offshore erosion control — chosen by what the water is doing at your site.
Read moreNearby
We work the rest of this water too.
Get started
Send us a photo of your waterfront.
Tell us what the water is doing and what you want out of the property. We’ll evaluate the site, give you a detailed estimate covering scope, materials, timeline and price, and handle the permitting. Commercial, municipal and agency inquiries reach the same phone.
Or send a photo straight from the inquiry form — it takes file uploads.
- Call(888) 519-2253
- Emailadmin@hastingsmarineconstruction.com
- Shop10372 Old Furnace Rd
Seaford, DE 19973 - Office hoursMonday – Friday, 8:00 AM – 5:00 PM
Closed Saturday & Sunday