Worcester County, Maryland · 21842
Marine Construction in Ocean City, MD
Back-bay frontage behind the resort, on water that takes boat traffic from May to September and open-bay fetch the rest of the year. Bulkhead country, and hard-worked bulkhead at that.
The water around Ocean City
Coastal and back-bay water: Isle of Wight Bay, Sinepuxent Bay, Assawoman Bay and the Atlantic — about 45 miles southeast of the shop.
Back-bay frontage behind the resort, on water that takes boat traffic from May to September and open-bay fetch the rest of the year. Bulkhead country, and hard-worked bulkhead — this is some of the most heavily loaded shoreline structure anywhere on the peninsula.
Access. Seasonal access restrictions matter; off-season scheduling is usually the sensible route. We cover ZIP code 21842 and the surrounding Worcester County shoreline.
What that usually argues for. Bulkhead where the lot runs to the water and there is no room to slope, rip-rap revetment where there is. Anything built here has to assume the worst summer weekend, not the average day.
Questions we get about Ocean City water
Why do bulkheads here seem to fail sooner?
Because they work harder. Constant summer wake plus winter fetch is a heavier duty cycle than most owners assume when they compare quotes.
Can work be done in season?
Sometimes, but access and restrictions make it slower and more expensive. Winter is usually better.
Permits in Maryland
Shoreline work in Maryland is regulated, and almost anything built in or over the water needs approval from the Maryland Department of the Environment, often alongside the U.S. Army Corps of Engineers. We handle that in house — preparing the plans, completing the applications and coordinating with the agencies.
Budget three to twelve months for agency review depending on the complexity of the project. It is the part of the schedule most people underestimate, so it is worth starting the conversation well before the season you want to be using the water.
Ocean City services
Bulkhead repair, docks and boat lifts in Ocean City, MD
Bulkhead repair in Ocean City
Back-bay bulkheads behind the resort take boat wake from May to September and open-bay fetch the rest of the year, which is why they wear out sooner than owners expect. We design bulkhead repair and replacement on Isle of Wight, Sinepuxent and Assawoman Bay for that load, schedule it for winter, and handle the MDE permit in house.
Dock builder in Ocean City
As a dock builder for back-bay lots, we build and repair fixed piers and floating docks, usually off-season when access is easier.
Boat lift installation in Ocean City
Boat lift installation on back-bay frontage: DECO lifts sized to your boat’s loaded weight, on piling driven for the lift and for the bay’s winter weather.
What we build here
The work that suits Ocean City water.
Bulkheads & Retaining Walls
Timber and vinyl walls that retain soil at the water’s edge, and retaining walls that hold grade further back.
Read moreRip-Rap
DelDOT-rated stone revetments, sized to the exposure and placed over proper filtration and bedding.
Read morePiers & Docks
Fixed piers, docks and floating docks across Delmarva’s waterways — built from CCA-treated piling and framing, with a choice of decking.
Read moreBoat Lifts
DECO Boat Lifts, sold and installed by the DECO dealer for Delmarva — on piling sized for the lift.
Read moreNearby
We work the rest of this water too.
Get started
Send us a photo of your waterfront.
Tell us what the water is doing and what you want out of the property. We’ll evaluate the site, give you a detailed estimate covering scope, materials, timeline and price, and handle the permitting. Commercial, municipal and agency inquiries reach the same phone.
Or send a photo straight from the inquiry form — it takes file uploads.
- Call(888) 519-2253
- Emailadmin@hastingsmarineconstruction.com
- Shop10372 Old Furnace Rd
Seaford, DE 19973 - Office hoursMonday – Friday, 8:00 AM – 5:00 PM
Closed Saturday & Sunday
