Sussex County, Delaware · 19945
Marine Construction in Frankford, DE
Vines Creek is shallow, soft-bottomed and winding, which rules a lot of equipment out. Most of what gets built here goes in from a barge, and pile has to be driven to refusal because the bottom gives no help.
The water around Frankford
Tidal bay and creek water: Vines Creek and Indian River Bay — about 28 miles southeast of the shop.
Vines Creek is narrow, winding and soft-bottomed, and the mud is deep enough that pile driven to a fixed depth will keep going. Everything here has to be driven to refusal, which on this creek can mean considerably longer pile than an owner is expecting.
Access. Land access to most of the creek is poor. Assume barge work and price it in from the start. We cover ZIP code 19945 and the surrounding Sussex County shoreline.
What that usually argues for. Rip-rap and living shoreline suit most of this water, with bulkhead reserved for lots that genuinely need a vertical edge. Pile gets driven to refusal because the bottom will not hold it otherwise.
Questions we get about Frankford water
Why is my quote asking for longer pile than my neighbor's?
Because refusal depth is not uniform along this creek. Two lots a hundred yards apart can want very different lengths, and the bottom decides, not the drawing.
Is Vines Creek deep enough to get equipment in?
In most places, on the right tide. It is one of the reasons we work from a barge here rather than a truck.
Permits in Delaware
Shoreline work in Delaware is regulated, and almost anything built in or over the water needs approval from the Delaware Department of Natural Resources and Environmental Control. We handle that in house — preparing the plans, completing the applications and coordinating with the agencies.
Budget three to twelve months for agency review depending on the complexity of the project. It is the part of the schedule most people underestimate, so it is worth starting the conversation well before the season you want to be using the water.
What we build here
The work that suits Frankford water.
Rip-Rap
DelDOT-rated stone revetments, sized to the exposure and placed over proper filtration and bedding.
Read moreLiving Shorelines
A site-specific, nature-based approach to holding a shoreline — planted, built and monitored until it establishes.
Read morePiers & Docks
Fixed piers, docks and floating docks across Delmarva’s waterways — built from CCA-treated piling and framing, with a choice of decking.
Read moreBulkheads & Retaining Walls
Timber and vinyl walls that retain soil at the water’s edge, and retaining walls that hold grade further back.
Read moreNearby
We work the rest of this water too.
Get started
Send us a photo of your waterfront.
Tell us what the water is doing and what you want out of the property. We’ll evaluate the site, give you a detailed estimate covering scope, materials, timeline and price, and handle the permitting. Commercial, municipal and agency inquiries reach the same phone.
Or send a photo straight from the inquiry form — it takes file uploads.
- Call(888) 519-2253
- Emailadmin@hastingsmarineconstruction.com
- Shop10372 Old Furnace Rd
Seaford, DE 19973 - Office hoursMonday – Friday, 8:00 AM – 5:00 PM
Closed Saturday & Sunday
